CNAO Expansion Project
Andrea Perrucci - Site
Operations Coordinator
CNAO expansion works have very challenging technical and technological aspects: we built 2-meter high slab, 4-meter wide and 13-meter high massive walls. Excavations were carried out up to 12 meters below elevation 0.